Hands-On Outside Plant Technician OSP: Bonding & Grounding, Copper Cable Splicing, OSP Tester/Fault Locating & Cable Troubleshooting |
Module I: OSP BONDING AND GOUNDING
A. Electrical Principles
a. Ohms Law
B. Lighting
a. Surge Potentials
b. Personnel Danger
C. AC Power Distribution
a. Power Distribution Schemes
b. Hazardous Faults
c. Testing For Stray Voltages
D. Telephone Outside Plant
a. Effects Of High Voltage And Current
b. Physical Makeup Of The OSP
E. Bonding And Grounding The Outside Plant
a. NEC And RUS Specifications
b. Grounding Procedures At The Customer Premise
F. Central Office Grounding
a. Single Point Grounding Method
Module II: COPPER CABLE SPLICING
A. Safety
a. Proper Use Of Tools
b. How To Open A Cable Safely
B. Pair Counts
a. Color Code
b. Print Reading
C. Splice Types
a. Straight
b. Bridge
c. Halftap
D. Splice Connector Types
a. Scotch Loks
b. Modules
c. Amps
E. Closures
a. Aerial
b. Buried
F. Bonding And Grounding
a. Shield Bond Connectors
b. Proper Installation
c. Bonding Straps
G. Test Acceptance
a. Testing Spliced Pairs
Module III: OSP TROUBLESHOOTING AND FAULT LOCATING
A. Test Equipment Operation
a. VOM
b. DynaTel
c. Sidekick
d. Fluke
B. Understanding And Testing The Local Loop
a. Voltage And Current
b. Circuit Loss
c. Noise And Power Influence
C. Identifying Faults
a. Resistive
b. Capacitive
c. Sheath Faults