1. Prepare to Install and Terminate Coaxial Cable
1.1. Prepare for given work according to relevant legislation , codes , regulations and standards 1.2. Arrange access to the site according to required procedure 1.3. Inform appropriate personnel of identified hazards on worksite 1.4. Select coaxial cable type , connectors and manufacturer's tool to comply with installation environment and customer requirements 1.5. Check proposed route and bend radius to meet manufacturer's specifications and industry standards 1.6. Test cable on drum for radio frequency (RF) continuity | |
2. Install, Terminate and Test Coaxial Cable |
2.1. Maintain cable segregation to industry standards 2.2. Protect the integrity of the coaxial shield cable to ensure no loss of signal during operation and maintain bend ratios to not exceed manufacturer's specifications and industry standard 2.3. Locate securing hardware at uneven distances to minimize the cumulative effect on cable wave shape properties 2.4. Install cable following occupational health and safety (OHS ) and environmental requirements and complying with manufacturer's specifications and industry standards 2.5. Terminate the cable and perform the type of termination specified in the plan using safe work practices and according to manufacturer's specifications 2.6. Test the termination for transmission loss and strength and re-terminate the coaxial cable if the transmission loss exceeds the manufacturer's specifications 2.7. Record all measurements 2.8. Fit over-voltage protection devices to all cables with metallic component where required |
3. Remove Fiber Hazards from Work Area |
3.1. Clean work area thoroughly to minimize risk of injury from loose glass fibre 3.2. Dispose of waste safely according to relevant environmental requirements 3.3. Restore worksite to the customer's satisfaction |
4. Document Installation |
4.1. Update plans and records with details of installation and test results 4.2. Notify client of work completion and obtain sign off |