Website: http://www.btstraining.com
Toll Free: 1-877-Info2Day
Email: info@btstraining.com
Hands-On
Installation Bonding and Grounding for TeleCom
MN State License Course Program ID 2104678
 
Course Description
The State of Minnesota Board of Electricity requires that technicians doing electrical work in a residence or commercial building must hold an Electricians License. This includes low voltage systems, such as telecommunications voice or data circuits, which requires the individual to have a Low Voltage Electrical License. The License is renewable every two years and requires 16 hours of Continuing Education 4 hours on the NEC Code and 12 hours on the statutes and rules governing electrical installations or technical topics related to electrical installations and equipment. This seminar is Certified by the Department of Labor Industry (course number 101203.01) and meets the requirements for 8 hours of non-NEC Code Continuing Education.

This 8-hour training seminar is specifically related to the electrical installation of telecommunications equipment for proper bonding and grounding for personnel and equipment protection from lightning and AC power fault conditions. This seminar pertains to telecommunications circuits and equipment that are in, on or service to buildings including residential, commercial and telephone buildings (Central Offices, Remotes, Cabinets, etc.). This seminar explains not only the requirements but also the technical reasons for the requirements. The attendee will have a much better understanding of why the requirements exist.

References used for this seminar

9642 Rural Utilities Service (RUS) documents.
9642 National Electric Safety Code (NESC 20172018) or current edition.
9642 Telecommunications company specific requirements.
9642 References to the National Electrical Code (NEC 20172018)
Students Will Learn
Prerequisites
Current Minnesota Power Limited Electrical License
Course Outline

Lesson 1 Installing Bonding & Grounding for Telecommunications Cables and Equipment in the Outside Plant.                                                                               2 hours

 

 

This lesson covers general requirements for the safe installation bonding and grounding of telecommunications equipment in the telephone outside plant cables, pedestals, cross-connect boxes and aerial closures for the protection of people, buildings and equipment in accordance with NESC (National Electric Safety Code) and the RUS (Rural Utility Services) practices and requirements.

 

 

Lesson 2 Installing Bonding & Grounding for Telecommunications Cables and Equipment at Residential and Commercial Buildings.                                      2 hours


 

 

This lesson covers general requirements for the installation bonding and grounding of telecommunications equipment at residential and commercial buildings for the safety and protection of people, buildings and equipment in accordance with RUS (Rural Utility Services) practices and requirements:

 


 

Lesson 3 Installing Bonding & Grounding for Telecommunications Central Office Circuits and Equipment.                                                                                            2 hours

 

This lesson covers general requirements for installation bonding and grounding of telecommunications Central Office cables and equipment for the safety and protection of people, buildings and equipment per the RUS (Rural Utilities Service):

 

 

 

Lesson 4 Installing Bonding & Grounding at Telecommunications Remote Electronic Equipment Sites.                                                                                     1 hour

 

 

This lesson covers general requirements for safe installation bonding and grounding of telecommunications electronic equipment located in remote cabinets and housings for the safety and protection of people, buildings and equipment per the NESC and RUS (Rural Utilities Services).

 

 

 

Lesson 5 Testing Telecommunications Bonding & Grounding Installations. 

                                                                                                                        1 hour

 

 

This lesson covers the standard requirements for testing of telecommunications bonding and grounding systems to verify a proper and effective installation per the RUS (Rural Utilities Service).

 

 

 

 

Delivery Method
Instructor-Led with exercises throughout the training
Equipment Requirements
(This apply's to our hands-on courses only)
BTS always provides equipment to have a very successful Hands-On course. BTS also encourages all attendees to bring their own equipment to the course. This will provide attendees the opportunity to incorporate their own gear into the labs and gain valuable training using their specific equipment.
Course Length
1 Day

Website: http://www.btstraining.com
Toll Free: 1-877-Info2Day
Email: info@btstraining.com