Lesson
1 Installing Bonding & Grounding for
Telecommunications Cables and Equipment in the Outside Plant. 2 hours
This lesson covers general requirements for the safe installation bonding and grounding of telecommunications equipment in the telephone outside plant cables, pedestals, cross-connect boxes and aerial closures for the protection of people, buildings and equipment in accordance with NESC (National Electric Safety Code) and the RUS (Rural Utility Services) practices and requirements.
Lesson
2 Installing Bonding & Grounding for
Telecommunications Cables and Equipment at Residential and Commercial
Buildings. 2
hours
This lesson covers general requirements for the installation bonding and grounding of telecommunications equipment at residential and commercial buildings for the safety and protection of people, buildings and equipment in accordance with RUS (Rural Utility Services) practices and requirements:
Lesson 3 Installing Bonding & Grounding
for Telecommunications Central Office Circuits and Equipment. 2 hours
This lesson covers general requirements for installation bonding and grounding of telecommunications Central Office cables and equipment for the safety and protection of people, buildings and equipment per the RUS (Rural Utilities Service):
Lesson 4 Installing Bonding & Grounding
at Telecommunications Remote Electronic Equipment Sites. 1 hour
This lesson covers general requirements for safe installation bonding and grounding of telecommunications electronic equipment located in remote cabinets and housings for the safety and protection of people, buildings and equipment per the NESC and RUS (Rural Utilities Services).
Lesson 5 Testing Telecommunications Bonding & Grounding Installations.
1 hour
This lesson covers the standard requirements for testing of telecommunications bonding and grounding systems to verify a proper and effective installation per the RUS (Rural Utilities Service).