Module I. What is an EPM and what are its benefits?
- Planning an EPM Program
- Personnel Safety
- Equipment Loss
- Production Economics
- Main Parts of an EPM Program
- Programmed Inspections
- Recordkeeping
- Training for Safety and Technical Skills
Module II. Planning and developing a program
- Survey of Electrical Installations
- Data Collection
- Single Line Diagrams and Data
- Electrical Equipment Installation Change
- Lighting System Diagrams
- Ventilation
- HVAC
- Control and Monitoring
- Emergency Procedures
- Test and Maintenance Equipment
- Identification of Critical Equipment
- Establishment of a Systematic Program
- Inspection Frequency
- Forms, Planning, Records
Module III. Electrical Testing and Maintenance Standards
- Review of NETA's Latest Electrical Maintenance Testing Specifications
- NETA's ANSI Standards for Transformer maintenance
- NETA Critical Switchgear maintenance
- Review of NFPA 70b Electrical Maintenance Standard
Module IV. Test Equipment Overview
- Insulation Resistance Test Sets (Hipot, Meggar, VLF)
- Contact resistance Testing (Ducter)
- Power Factor Sets (Cap Bridge, Doble)
- Transformer Sets (Winding Resistance, TTR)
- Relay Test sets and AC Current Sources
Module V. Personal Safety
- Qualification, Tools, Equipment, Training, Arc Flash, NFPA 70e, PPE
Module VI. Fundamentals of Electrical Equipment Maintenance
- Scheduling, cleaning, environmental concerns, equipment additions and retrofits
Module VII. Substations and Switchgear Assemblies
- Insulators
- Conductors
- Air-Disconnecting Switches
- Grounding Equipment
- Enclosures
- Switchgear Assemblies
- Air Circuit Breakers
- Arc Interrupters
- Oil Circuit Breakers
- Interrupter Switches
- Gas-Insulated Substations and Gas-Insulated Equipment
- Maintenance and Repair of the GIS and GIE
- Surge Arresters
- Instrument Transformers and Auxiliary Transformers
- Protective Relays, Meters, and Instruments
- Ground-Fault Indicators
- Network Protectors
Module VIII. Power and Distribution Transformers
- Liquid-Filled Transformers
- Regular Inspections
- Current and Voltage Readings
- Temperature Readings
- Liquid-Level Indicator and Pressure/Vacuum Gauges
- Special Inspections and Repairs
- Liquid Maintenance and Analysis
- Fault-Gas Analysis
- Dissolved-Gas-in-Oil Analysis
- Dry-Type Transformers
- Regular Inspections
- Current and Voltage Readings
- Temperature Readings
Module IX. Power Cables
- Visual Inspection
- Aerial Installations
- Raceway Installations
- Cable Testing
Module X. Motor Control Equipment
- Motor Control Preventive Maintenance Guide
- Components and Maintenance of Motor Controls
- Enclosures
- Bus Bar, Wiring, and Terminal Connections
- Disconnects
- Molded Case Breakers
- Fuses
- Contactors
- Motor Overload Relays — Thermal Types
- Pilot and Miscellaneous Control
- Devices
- Mechanical Interlocks
Module XI. Molded-case Circuit Breakers
- Types of Molded-Case Circuit Breakers
- Phase-Fault Current Conditions
- Ground-Fault Tripping
- Special-Purpose Breakers
- Inspection and Cleaning
- Loose Connections
- Mechanical Mechanism Exercise
Module XII. Ground Fault Protection
Personal and Equipment Protection
Module XIII. Fuses
- Fuses Rated 1000 Volts or Less
- Fuses Rated over 1000 Volts
- Installing and Removing Fuses
- Inspection, Cleaning and Servicing
- Replacement
Module XIV. Rotating Equipment
- Maintenance, cleaning, Testing
- Stator and Rotor Windings
- Brushes, Collector Rings, and Commutators
- Bearings and Lubrication
Module XV. Testing and Test Methods
- Acceptance Tests and Maintenance Tests
- Frequency of Tests
- Special Precautions and Safety
- Qualifications of Test Operators
- Insulation Testing
- Dielectric Absorption
- Protective Device Testing
- Circuit Breaker Tests
- Transformer Turns-Ratio and Polarity Tests
- Impedance Testing of Equipment Grounding Conductor
- Infrared Inspection
- Meggaring, Continuity, Hi-Pot testing of equipment
Module XVI. Uninterruptible Power Supply
(UPS) Systems
- UPS System Maintenance Procedures — General
- System Tests, Routine Maintenance, Special Tests
Module XVII. Power Quality
- Harmonics
- Transients (Surges)
- Voltage Sags and Swells
- Long-Duration Undervoltages
- Sustained Voltage Interruptions
- Unbalanced Voltages and Single Phasing
- Symptoms — Grounding
- Voltage Fluctuations and Flicker
Module XVIII. Grounding
- Symptoms and Causes of Inadequate Grounding
- Grounding System Inspection, Testing, and Monitoring
- Solutions to Inadequate Grounding
Module XIV: EPM from Commissioning (Acceptance
Testing) Through Maintenance
- Commissioning Planning Stages
- Submit Functional Performance Tests (FPTs)
- Costs of Commissioning, New Construction
- Suggestions for Inclusion in a Walk-Through Inspection Checklist
Module XX: Single Line Diagrams and Symbols
Module XXI. Forms to Document all Tests and Inspections
- Battery inspections
- Breaker Inspections
- Test Results
- Transformer tests, inspections,
- Ground System Tests
- Long-Term Maintenance Guidelines